Project: wcooper   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

Mar 04, 2023     Rudder Cable Vinyl Tubing       Category: Fuselage
The Air Conditioner has quite a bit of hoses in the tunnel area that have a potential to cause chafing against the rudder cables. SFSA provided some vinyl tubing. It was just a little short for both sides. I got some extra but it wasn't pre-split. I made a Tube Splitter out of a 2x4 and a razor blade. I cut an angle off the 2x4, drilled a 1/2 inch hole and then split the 2x4 in half. I inserted a razor blade and clamped it together. Passing the tubing through the hole splits the tubing lengthwise and makes nice anti-chafe protection in the tunnel.


 